Wow, what a difference a day makes! These guys are seriously fast.  Kevin said it's a "smaller" job for them--you know, moving doors and windows, all in a days work (I guess)...
Before you could blink an eye, the pier foundations were poured and inspected

The slider was moved from the South side of the back to the North side

(clearly a lot of junk is involved--luckily we've had PERFECT weather in the 60s for these guys and very little major rain)

What's left of the hole from the previously located slider doors--that dramatically and beautifully led to the view of the...fireplace vent?? I swear, this builder...

Beautiful Spring weather and construction that will give us amazing use of our yard!